Theme Park Paradise

Garden Grove
18 guests
7 Bedrooms
4 Bathrooms

🎢 Welcome to the Ultimate Theme Park Retreat! ✨

 

Enjoy 2 themed homes on 1 lot—one Disney-inspired and one Universal-inspired—filled with immersive rooms, secret passages, and nonstop fun for the whole family.

 

Highlights:

🛏️ 7 themed bedrooms

🎬 Indiana Jones theater + free-play arcade

🌴 Large yard with gated pool, mini-golf, ping pong, kiddie rides & carousel

🏆 Disney vs. Universal treasure hunt challenge

 

Max occupancy: 18 guests total, including kids and adults.

🎬✨ Welcome to the Ultimate Theme-Park Compound ✨🎬

Brought to you by OC Adventure Homes

 

This one-of-a-kind retreat features two fully themed homes on one lot, designed to feel like your own private theme park. The front home brings classic Disney-inspired magic, while the second home delivers Universal-inspired adventure—all connected by a shared outdoor playland built for nonstop fun.

 

Perfect for large families, multi-family trips, and group getaways, this is more than a place to stay—it’s an experience kids (and adults) will be talking about long after checkout.

 

⚠️ Please note: the maximum occupancy is 18 guests total, including all adults and children.

 

🏰 MAIN HOME – DISNEY-INSPIRED MAGIC

 

Every room in the main house tells a story, blending nostalgia, imagination, and hidden surprises.

 

🦜 Pirates of the Caribbean Master Suite

 

Step into a candle-lit pirate hideaway where adventure lurks behind every detail. Weathered textures, nautical accents, and dramatic lighting set the mood for a high-seas escape.

 

✔️ King Bed

✔️ Smart TV

✔️ Private ensuite bathroom

✔️ Secret bookcase entrance leading directly into the movie theater

 

✨ Peter Pan Kids’ Room

 

A whimsical Neverland adventure where kids can fly off to dreamland. Designed for play, laughter, and late-night storytelling.

 

✔️ One Triple Bunk + One Double Bunk

✔️ 5 Total Beds

✔️ Smart TV

✔️ Bright, imaginative décor perfect for younger guests

 

🚀 Buzz Lightyear Space Bedroom

 

Blast off into a sleek, space-inspired retreat filled with cosmic energy and futuristic touches.

 

✔️ Queen Bed

✔️ Smart TV

✔️ Clean, bold sci-fi theming

 

🏘️ Mickey’s Toontown Bedroom

 

A playful, colorful space inspired by classic cartoon charm—bright, cheerful, and full of personality.

 

✔️ King Bed

✔️ Smart TV

✔️ Fun, animated design details

 

🎬 Indiana Jones Movie Theater & Free-Play Arcade

 

Adventure takes center stage in this action-packed entertainment zone.

 

🗺️ Temple-inspired décor

🎥 Large-screen movie theater

🕹️ Free-to-play arcade machines

🍿 The perfect space for movie nights, rainy days, and epic family competitions

 

♠️ Alice in Wonderland Living Room & Kitchen

 

Nothing is quite what it seems in this imaginative gathering space. This whimsical living room and kitchen combo is the heart of the home, designed for gathering, relaxing, and making memories together.

 

🛋️ Seating for 8

📺 Smart TV

🎮 Xbox One with free Xbox Game Pass Unlimited

🍽️ Kitchen stocked with cooking essentials

🥣 Cereal and snacks available for guests

🎲 Board games and family hangout vibes

 

🚿 Themed Bathrooms

 

🕯️ Haunted Mansion Bathroom – moody, mysterious, and atmospheric

🦜 Pirates of the Caribbean Bathroom – the private ensuite attached to the master suite, continuing the immersive pirate theming

 

🎥 SECOND HOME – UNIVERSAL-INSPIRED ADVENTURE

 

Tucked behind the main house, the second home delivers blockbuster excitement with its own immersive worlds.

 

⚡ Harry Potter Master Suite

 

A magical retreat filled with spellbinding details—perfect for witches, wizards, and fans of fantasy.

 

✔️ King Bed

✔️ Smart TV

✔️ Private Ensuite Bathroom

 

🍄 Super Mario Bedroom

 

Bright, bold, and playful—this room feels like stepping into a video game world.

 

✔️ King Bed

✔️ Smart TV

✔️ Colorful, game-inspired design

 

🎭 Minions Kids’ Room

 

A high-energy space bursting with fun, mischief, and laughter.

 

✔️ Two Triple Bunk Beds

✔️ 6 Total Twin Beds

✔️ Smart TV

✔️ Designed for kids to play hard, laugh loud, and sleep well

 

🦖 Jurassic Park Living Room & Kitchen

 

A cinematic jungle escape with adventurous flair—perfect for relaxing between expeditions. This themed living room and kitchen combo has everything you need for a cozy stay in the second home.

 

🛋️ Comfortable seating

📺 Smart TV

🦕 Immersive dinosaur-inspired décor

🍽️ Dining for 4

🍳 Cooking essentials provided

🥣 Cereal and snacks available for guests

 

🚿 How to Train Your Dragon Bathroom

 

Fantasy-inspired details bring this imaginative world to life in unexpected ways.

 

🌴 SHARED OUTDOOR PLAYLAND

 

Both homes open to a shared backyard designed for kids to run, play, and explore while adults relax nearby.

 

⛳ Mini-golf

🎠 Kiddie rides, including a carousel

🏓 Ping pong

🏊 Pool with 4-foot depth throughout

🔒 Pool is gated on all sides for added child safety

🍽️ Outdoor dining area

🎯 Open play space and backyard fun for all ages

 

🏆 INTERACTIVE TREASURE HUNT EXPERIENCE

 

This home also includes a themed treasure hunt competition where your group can choose Team Disney or Team Universal and face off to see which side comes out on top.

 

Only one team can win — so choose wisely and get ready for some friendly competition.

 

✨ WHY GUESTS LOVE THIS HOME

 

✔️ Two homes = more space + more privacy

✔️ Every bedroom has a Smart TV

✔️ Free-to-play arcade games

✔️ Indoor + outdoor entertainment

✔️ Immersive theming throughout both homes

✔️ Treasure hunt competition built into the experience

✔️ Great for large families, reunions, and group trips

Amenities

Air Conditioning
Central Heating
Baking Sheet
Blender
Coffee Maker
Pots & Pans
Dishes & Utensils
Dishwasher
Check-In
Check-Out
Guests

Frequently Asked Questions

How close are your properties to Disneyland and other attractions?

Our homes are conveniently located within a short drive to Disneyland, typically ranging from 2 to 14 minutes. We recommend choosing the theme that excites you the most, as the drive time will be minimal compared to the lasting memories you'll create during your stay.

Are pets allowed at your properties?

Unfortunately, we cannot accommodate pets. As much as we love dogs ourselves, we want to ensure a comfortable stay for all our guests, including those with pet allergies, by guaranteeing a pet-free environment.

Do you offer grocery stocking service?

Yes, we do! To ensure your vacation is as seamless as possible, we offer a grocery stocking service so you can arrive to a fully pre-stocked fridge and start enjoying your stay right away.

What are the check-in and check-out times?

Check-in is at 4 PM and check-out is at 11 AM. If our schedule allows (no back-to-back bookings), we're happy to accommodate early check-ins or late check-outs to make your stay more convenient.

Are your properties child-friendly?

Absolutely! Our properties are designed with families in mind, ensuring that everything is child-friendly and durable, so you can relax and enjoy your stay without worry.

What is your cancellation policy?

To account for credit card processing fees, we offer a 95% refund for cancellations made up to 30 days before your stay, and a 45% refund up to 14 days prior. The 5% fee covers the non-refundable credit card processing costs.

Are there any special offers or discounts available for direct bookings?

While we don't offer additional discounts beyond our competitive direct rates, we can match rates found on other platforms. We also provide special discounts for returning guests as a token of our appreciation.

Are parties or gatherings allowed at the property? Even if it's just during the day?

To keep things cozy and relaxing for everyone, we don’t allow parties or gatherings at our properties. We do have guest limits in place to ensure everyone enjoys their stay, and this applies to both overnight guests and daytime visitors. We appreciate your understanding in helping us maintain a peaceful environment for all our guests (and neighbors). If you’re unsure about the guest count or have any special requests, we’re always happy to chat and help make your stay as smooth as possible!